Existing bathroom suite, shower and tiles removed.
- New bathroom, shower and tiles.
- Pipework is currently above floor level and we'd like this moving under the floor - potentially move of the sink to the other side of the room and re-positioning of the toilet.
- Mixer shower to be fitted. system is gravity fed
-Towel radiator fitted
- We would like the bath tiling in and the floor tiled too.
Archive for Plumbers, Heating