Remove old suite(Toilet Sink and Bath), and install new toliet sink and shower enclosure. (Work to flooring required for new shower enclosure)
Replacing of heated towel rail
Tiling for floor approx 4m2
Tiling for 2 walls 6m2
Skirting Board and Coving to be included.
Small adaption of existing pipework, as i would like current sink location moved.
Making good of walls
All materials will be supplied apart from plumbing materials.
Removal of old suite to be removed after completion
People can look at job just post a comment and i will get back.
Archive for Carpenters, Joiners, Handymen