As a result of a leak in our bathroom (now fixed) we need to pull up the existing tiled floor and if required replace plywood/ underlay flooring which has been damaged. The floor then needs be re tiled. It's a small bathroom (floor is 2-3m2) but does have fitted units which need to be preserved and sealed back in place at the end.
Archive for Flooring, Carpeting