Total bathroom overhaul needed. We will already have new suite.
Required is a new floor as existing is badly damaged. Resite of bath to different wall. Fitting of electric shower above the bath. Tile removal and new tiles fitting. Possible ceiling replace and some plastering may be required. Laying of new floor covering. New plastic window ledge.
This is quite a big job and visits welcome to give an accurate quote.
Archive for Plumbers, Heating