I have laminate flooring that was laid by the previous owner but they never got round to beading the gap between the wood and the wall. This is an average size hall and is mostly normal angles but there are some odd ones around the door frame mouldings as they cut round them instead of going under them. This is a small job, I only need the beading cut and can glue it down myself (Im guessing 30 mins for the right man).
Archive for Carpenters, Joiners, Handymen