New heating to first floor two bed flat. Supply and fit. 7no rads,combi boiler (budget£600), fitted into existing airing cupboard (next to kitchen and bathroom), after removing hot& cold tanks. Pipes to be in copper,fitted under floor where possable. Connect hot water to Sink & WHB. New Gas main 10m long from groundfloor meter to boiler. Remove existing bath and electric shower. Install new shower tray, combi shower Budget £150, glass two side shower cubical budget £250,wall tiling 9m2 budget £10/m2. Allow for patching plaster prior to tiling.Allow for sealing.
Archive for Plumbers, Heating