1) Feed from fuse box, round outside of house (in trunking?) to old utility room that has been converted into a shower.
Supply and fit 800mm x 500mm (approx) electric towel rail with thermostatic element, via a timer (also needing to be supplied and fitted).
2) In small toilet, take new supply from fuse box into new socket (also to be supplied). Socket to have a plug in thermostat and connected to it will be a small white tube greenhouse waterproof heater - both of these I can could order from e.g. Amazon.
Both jobs need to be fully Electric Safe as work being conducted in a student house.
Archive for Electricians