We request quotations to increase the length of our existing drop kerb. Currently 3 lengths of kerb are dropped we require an increase of a further 3 lenghts.
the tarmac footpath requires re-instatement.
we have 2 x water meter covers that will also require lowering - in line with the new gradient of the kerb.
Note: our highway is non maintainable by the local council. i have written clarification that we can proceed with the works with our own contractors.
Archive for Masonry, Paving, Concrete