Remove quary tiled floor and dig out for a concrete slab. Instal a DPM and lay a concrete slab.
Dig out for a downstairs toilet and install soil pipe, connecting to the existing soil via a t junction.
Create opening for french windows, installing appropriate lintle.
Install french windows.
Brick and block up 2 old windows removing original soldier course to match existing brickwork.
Create new window opening useing supplied lintel.
Archive for Construction, Builders, Tradesmen