Owners will provide paving, hardcore and other materials, skip for old material disposal.
Front garden approx 11mts x 4mts.
• Remove(including roots) 2 x hedges from front of garden totalling 8-9mts length, 5ft high and 3 x small box hedge from under windows
• Remove topsoil and turf to depth of 5inches
• Remove 1 x cement edging strip at back of turf, ¾ width of garden
• Level ground
• Place hardcore(provided)3 x 1 ton bags over whole area and whack down
• Lay anti weed membrane(provided) over whole area
• Position new patio circle slabs(2.7m diameter) with wet-mortar base (all provided)
• Dry mortar grout between slabs
• Remove 24 (in 2 paths of 2x6 slabs) 600x600mm each and replace with new 600x600 slabs(provided)
• Place new preformed cement edging sections(provided) along front and side boundaries
• Distribute 4 x 1 ton bags (provided) new stone chips throughout areas that are not path or new paved circle.
work to be started in 2 weeks, completed quickly