I have a number of jobs that need doing. All jobs have to be completed satisfactorily by 10th September.
1. Paint bathroom tiles. Re-seal edges of bath.
2. Drill holes to enable fitting of wardrobe rails and shelves (this is a purchased frame that requires fitting into an existing area).
3. Paint kitchen tiles.
4. Fix cupboard to kitchen wall.
5. Prepare and paint indoor window frame.
6. Fix (with screws) internal roof access door.
Archive for Painter, Decorator