Small kitchen fit in first or second week in February. Involves some gas supply work into a fireplace. There is a gas supply to the right of the fireplace so will involve drilling through the fireplace wall to install the gas supply. Also may involve some plumbing work as a dishwasher and washing machine are moving positions, plumbing already exsists and appliances are only moving appox 1 ft. Some units will replace existing units but some (in the fireplace and island) are new. and all have new cabinets. There are ten cabinets in total including, in order of run from the doorway:
Unit to fit a freestanding slimline dishwasher. dishwaster plumbing will need moving from the other side of the sink (approx 1ft to the left)
Replacement sink unit (butler sink to be installed where standard sink sits now)
Unit to fit free standing washing mashine. Dishwasher currently sits in this space and the plumbing may need moving approx 1 ft to the left.
one standard base unit, another half size base unit and a full size wall unit, half of which covers a boiler in the corner of room.
Two half size base units either side of a range cooker in fireplace.
Fitting of a range cooker this will involve installing a gas supply.
Fitting of new island consisting of pan draws and wine racks.
Fitting and treating of solid wood worktops will require some customisation in the fireplace and also carefull cutting for the island to create an overhang for breakfast bar.