Bathroom
1) Mould killed
2) Plaster repairs (old screw holes and some damaged plasterboard)
3) Repainting
4) Floor prepared for Lino (probably involve putting down new surface). L-shaped w/ loo and sink, probably 6 ft x 3.5 ft (at widest point)
5) Lino fitting
6)Bath panel accessibility improved (reposition screws)
Hallway
1) Repainting - walls and ceiling.
2) Carpet cleaned - Hall is about 8 ft long and 3.5 ft wide at widest.
3) Moving of gas meter (if possible?)
4) Creation of hall cupboard around meters (price dependant – not vital!)
Lounge
1)Repair water damage to wall paper - replacing one or two strips of paper, top to bottom and repainting w/colour matching.
2)Repair water damage and repainting of coving - Cracks to be filled, some sealant applied, gloss painting.
Bedroom
1) Affixing edging for laminate flooring
2) Carpet divider bedroom/hallway
3) Repaint ceiling
Kitchen
1)Tiles degreasing and grouting. Tiles have been up for sevral years but never got round to grouting them. Need to be cleaned/grouted. Small kitchen, 6.5 ft sq.
2) Repainting
Cleaning
1) General top to bottom clean once jobs are done
Archive for Plasterers, Renderers