Kitchen layout has changed, so I need a new gas cooker point installed in a different location.
Not possible to extend pipe, so the work should involve teeing into a 22mm supply pipe and running 15mm pipe 2m down the wall and through into the inside of the house. The cooker bayonet connection will need connection and can probably be re-used as is only 1 year old.
The old pipe needs cutting and capping off.
Job can start immendately.
Thanks
Archive for Plumbers, Heating