Back-to-wall toilet needs to be moved approx 3 feet. Toilet waste needs to be dug into concrete floor, again about 3'. To be done as soon as possible. Thanks. Archive for Plumbers, Heating
What needs to be done?
Description*: Think about the important details: What needs to be done? Where? Dimensions? When?
* required