need a new boiler and a megaflow system fitting to my empty house. 4 beds 3 receptions with another bedroom to be added at a later date. 2no bathrooms with towel rails, cloakroom with towel rail, 11 rads. trv.s need fitting to rads and a full powerflush. Pipes are 10mm copper.
Archive for Plumbers, Heating