Provide new circuit for 9kW electric boiler (approx 8m) with local isolation.
New circuit or FCU from boiler circuit for heating controls (next to boiler).
Install heating controls.
All work required to ensure compliance with building regulations
Require work to be notified to building control though an approved scheme and a installation certificate provided when work completed.
I will provide heating controls (2 x thermostats & programmer).
You will need to provide all other materials (such as cable, mcb etc)
Work to be completed no later than Friday 25th November.
Photo of the CU attached if it helps.
You can come and have a look if you require.
Thanks.
Archive for Electricians