wanting my back garden sorting out, started it my self but its taking me to long by my self, need two sepertate patios laying totaling 27 m2 and need the garden rotovating and leveling out ready for soil which i may lay my self, or i may want laying. as i said i have already dug out for one patio only leaving a 3x3 to be dug out which may not need it after the garden has been leveled. im buying the slabs which will be natural indian sand stone, site visit welcome
Archive for Masonry, Paving, Concrete