Kitchen:
wall tile area = 4m2 + 15%, tiles needed = 4.6m2.
Removal of all tiles, kitchen units, and any blown plaster
full plaster re-skim to kitchen inc ceiling and all walls down to cupboard level.
Wall tiling, grouting, siliconing and cleaning of agreed areas.
Instillation of plywood and cushioned lion to floor areas.
Finishing joinery inc. boxing in, skirting boards.
Bathroom:
Wall tile are = 7.66m2 +15%, tiles needed 8.8m2.
Removal of the bathroom suite, tiles, and any blown plaster from the bathroom.
Strengthening of partition frame 200mm thick at top of bath.
Installation of James Hardie tile backerboard onto partition frame.
Straightening of all areas to be tiled.
Full plaster re-skim of bathroom including ceiling.
Dressing of bathroom suite (inc bath, basin, radiator and toilet) with taps, wastes and fittings.
Installation of bath and timber frame to support bath panel.
Wall tiling, grouting, siliconing, and cleaning of agreed areas.
Instilation of plywood and cushioned lino to floor areas.
Instillation of 3 piece suit + radiator, shower mixer, riser rail and front bath panel.
Finishing joinery including boxing in, skirting boards and hanging of new bathroom door.
Other:
Re skim of main bedroom
re skim of small bedroom
Re skim of upper landing area and stairway
Re skim of 1st floor living room.
Re skim of small ground floor utility room
dry-lining and re-skim of ground floor garage
all including re-hanging of radiators, removal of skirting boards, installlation of new skirting boards, hanging of new door in living room, and bedrooms.
Removal of suspended ceiling and small bit of stud work near stairway.
Instillation of stud partition frame in front of garage door.
Please provide quotes broken down into the 3 main areas listed above.
Archive for Tilers, Panelers, Mosaics