To fit Ecotec 630 system boiler and range tribune 210L pre plumbed cylinder into a newly renovated house (no fixtures or fittings in the way!). Pipework is already in situ, flue hole drilled, condensate pipe in place, most of the electric wiring ready. Gas only has to come straight in through the wall. Sensible quotes only as most of the pipework has been done ready. Timescale by end of October.
Archive for Plumbers, Heating