Bathroom needs to be prepared for damp proofing which has been arranged. the following needs to be done:
remaval of tiles
removal of bath and pipe casings,
Following the damp proofing and plastering which will be arranged, all the fittings will need to be re installed, as well as re tiling.
Archive for Plumbers, Heating