Requirements:
Remove existing tiles / skirting boards and replace wall tiles as below
Full wall behind bath.
Half wall behind sink
Full wall behind shower (but not needed past shower screen)
Half wall behind toilet
Tile in front of bath
Tile floor
Old toilet removed, new toilet installed.
New towel rail/radiator
New extractor fan
New double glazed window
Fix faulty light switch
Reinstall shower fitting and shower screen
New taps in sink
Archive for Electricians