1 (or potentially 2 at the most) 4x4 (10cm x 10cm) posts need repairing/replacing after suffering wind damage recently. Damaged post is partially cracked just below the soil line, so the entire post will need to be removed and replaced. 2nd post may not need to be replaced. TBC. Above soil line height of both posts is 150/160cm. Contractor to provide new post(s) please. Would like the work done ideally this week.
Archive for Carpenters, Joiners, Handymen