Replace bannister on two flights of stairs (3.6m each - only needed on one side of each staircase) and one bannister on the connecting corridor (2.3m).
Make uprights (not spindles - can explain design when you come to quote but rough idea is diamond cut-out in planks of wood/mdf. Will be painted afterwards). Uprights needed for hallway and only one of the staircases.
Supply and install everything.
If you can do the job before Christmas then great - otherwise it will have to be in March 2012 or later.
Archive for Carpenters, Joiners, Handymen