Large parts of the back wall need to be repointed and some of the front needs to be repointed. The repointing of the back wall is mostly at first and second floor level. The front is at ground level. I would ideally like the work to be completed before the end of October. I think it's about 30sq metres that needs doing in total.
Archive for Masonry, Paving, Concrete